Suroco Energy:Production Performance update
Post by Researcher , Gas Researcher
Suroco Energy Inc. (TSX VENTURE:SRN) reported that the Pinuna 2 well, which is the second well in the Suroriente Block development drilling program commenced drilling on February 26.
The press release is quoted as saying:
The Pinuna 2 well is being drilled with San Antonio rig SAI 15, which is the same rig that was used to drill the Pinuna 5 well. The well is targeting the Villeta ‘T’ and Lower ‘U’ reservoirs and will be drilled to a total depth of 2,983 m. The well is being directionally drilled from the Pinuna 1 surface location, with a bottom hole location approximately 350 m. from the Pinuna 1 vertical well which is currently producing at 1,550 bbls/day (226 bbls/day net to the Corporation after royalty). The well is being drilled to maximize the recovery of reserves in a four-way dip closed feature which is partially separated from the Pinuna 1 feature.
Click here to access the entire press release
Click here to access Suroco Energy Corporate Site
Questions about this article? Leave a comment below or contact our editorial team at editor@resourceinvestingnews.com.

Leave a Comment
What is Gas Investing News' Comment Policy?
Gas Investing News pre-moderates comments on our blog posts and post-moderates comments on news stories. We never censor comments based on political or ideological point of view. We only delete those comments that include the following transgressions: